Create a preliminary construction budget for your project, see what shapes the cost, and download a clear estimate to start the conversation with AP Construction.
Tell us what you're building and where. These drive the base ₱/sqm rate.
Select a region to apply local cost factors.
Difficult sites need more manual hauling, hoisting, and shoring — this raises overall cost.
Choose the quality of materials and finishes. This is the single biggest driver of your final cost per square meter.
Common project items that are not usually included in a base construction rate. Select what applies to your project. These are preliminary allowances and may vary based on location, site conditions, and final scope.
Select a project type to see relevant add-ons.
Choose how you would like to handle design and approvals. We include site preparation and a planning contingency in every estimate.
Total Project Cost Composition
Typical percentage split of the direct construction cost across trades, based on common Philippine residential BOQ structures. Use this to sanity-check contractor quotations line by line.
Typical Metro Manila retail prices for common materials, 2025–2026. Use this to spot-check whether a contractor's material markup is reasonable — actual prices vary by brand, supplier, and volume discount.
Provincial prices are often 5–15% lower for locally-produced items (hollow blocks, sand, gravel) but similar or higher for imported/branded items (cement, steel, GI sheets) due to freight.
Estimate the monthly amortization if you finance part of this project through a housing loan (Pag-IBIG, bank, or in-house financing).
Pag-IBIG rates ~6–7%; bank home/construction loans ~7–9%.
Illustrative only — actual approved loan amount depends on income requirements, appraised value, and lender policy.
Save up to 3 versions of your estimate (e.g. Economy vs Mid-Range, or NCR vs provincial) to compare them side by side before deciding.
No scenarios saved yet. Adjust the form above and click "Save Current" to add one.
Your preliminary estimate
₱0 / sqm effective rate
Budget Range
Tight Budget
Minimal buffer — riskier
₱0
Recommended
Use this for planning & loan sizing
₱0
Comfortable Buffer
Recommended for peace of mind
₱0
Cost Breakdown
Send your preliminary estimate to AP Construction. We’ll help verify the scope, site conditions, and next steps.
lightbulbPlanning notes
Add your floor area to see the key planning considerations for this project.